Accuracy classes
From the rough order-of-magnitude estimate (AACE Class 5) to the control estimate (Class 1) – matched to the maturity of the project. The accuracy depends on how much is actually fixed already.
The most expensive overruns do not arise on the construction site – that is just where they become visible.
A budget is only as good as the estimate behind it. Unclear accuracy and flat-rate contingencies reliably lead to budget overruns and discussions.
A good estimate makes two things visible: the accuracy – how reliable is the number? – and the risk – what can move it, and in which direction? That is exactly what distinguishes a basis for decisions from a ballpark figure. Disclosing both prevents the most dangerous illusion in the project business: a falsely precise number that everyone believes in until reality catches up with it.
The rough estimate is part of the Feasibility Analysis; it becomes more accurate with every project phase. Once the budget is set, it is controlled against the same structure – through Cost Control or as Project Controls on demand. Where benchmarks for the early phase are missing, DICTUM provides them from completed projects.
We estimate transparently and verifiably – at the accuracy each project phase requires.
From the rough order-of-magnitude estimate (AACE Class 5) to the control estimate (Class 1) – matched to the maturity of the project. The accuracy depends on how much is actually fixed already.
Work packages along the work breakdown structure, plus unit rates or benchmarks for each package – traceable down to the individual line item.
A justified range derived from the project risks instead of a flat mark-up. Anyone can read what the contingency is for.
Independent review of third-party estimates and change orders – the neutral second opinion before you approve or award.
A clean structure as the basis for later cost control: estimating and control follow the same logic, otherwise plan cannot be compared with actual.
Four steps – and the result is not a single number but a justified total with known accuracy.
First the quantities: what has to be built, installed, tested and documented? The work breakdown structure sets the structure, and each work package gets its quantity. An estimate without quantities is an opinion.
Every line item with unit rates or benchmarks from comparable projects. Where there is no sound basis, this is openly marked as an assumption – not covered up.
The risks are assessed individually and the contingency is derived from them. Together with the accuracy class, this gives a range instead of a falsely precise number – and therefore an honest basis for decisions.
The cost structure goes into cost control exactly as it was estimated. Only then can every later variance be traced to the line item where it arose.
Three moments – what they have in common is that a signature is due soon.
A sound budget is not an end in itself: it needs to be controlled, defended and held throughout the project.
Scheduling, Cost Control and Document Control for capital projects – flexibly scalable from 0.1 FTE.
More on Project Controls on demandCost tracking, forecasting and variance management across the entire project.
More on Cost ControlManaging contracts, controlling variations, substantiating claims – on the operator's side.
More on Contract & Claims ManagementWe support capital projects in these industries:
Because their cause often lies in an overly optimistic estimate: missing items, quantities set too tight, forgotten costs for site facilities and equipment. On site, the overrun merely becomes visible – it was built in long before. A reliable estimate is therefore the basis of staying on budget.
Yes. We check quantities, prices and completeness for plausibility, neutrally, and identify where a bid is priced too tightly and change orders become likely as a result. A conspicuously low bid therefore deserves a second look.
Consistently bottom-up from quantity take-offs instead of lump-sum estimates. Every line item gets a traceable basis – a unit rate, a benchmark or a flagged assumption. This makes the estimate verifiable and negotiable, line item by line item.
A stronger negotiating position and fewer variations. If you know where a bid is priced too tight, you can settle it before signing rather than during the project. The review usually saves more than it costs.
We charge by the hour, by day rates or at a fixed price – we work out together which model fits. The effort depends on the size of the project and the accuracy class you need. A review is considerably faster than building an estimate from scratch. For a first indication, the project scope and timing are enough for us. The initial call is free of charge.
Terms such as cost estimate and accuracy range are explained in our glossary – along with 58 other terms from the turnaround and project business.